HotFix Rhinestones - basic principles
HotFix Rhinestones - Basic Principles
|
| ||
Application
| CoolingIt takes about 5 minutes for the glue to cool down after the application. After this time, the stones are fixed to the base material. | CuringThe glue should cure for 24 hours to get firm and durable. Do not handle or wash the textile material during this period. | CareTextile material with applies stones can be washed at 60℃. tumble dried, dry-cleaned and carefully ironed. |
Shape of the Base Material
Base material without a flat area (rounded, dome-shaped surface) or under bending stress in the application area (e.g, zippers) is not suitable for applying big stones in particular.
|
| |
Material without a flat area | Material under bending stress |
Pressure
The application pressure depends on the chosen Hotfix Stones, base material and technical equipment (applicator & machine etc.). Choosing an appropriate pressure when applying the hotfix stones is another of decisive factors for a high-quality bond between the stone and the base material. It is recommended to test the pressure on a material sample.
| ||
Low pressure - the glue does not adhere |
Optimal pressure - the glue adheres without spreading out | Pressure too high - the glue spreads out |